todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
todo [2019-08-29 15:08] – [Small Tasks] tim | todo [2019-08-31 22:19] – [Small Tasks] tim | ||
---|---|---|---|
Line 12: | Line 12: | ||
* Wire-up LEDs for one remaining tool locker. | * Wire-up LEDs for one remaining tool locker. | ||
* Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | ||
- | * Install a locker controller and LED in the battery-charging compartment. | ||
* Move G6 (Al's room) access point to G11. | * Move G6 (Al's room) access point to G11. | ||
todo.txt · Last modified: 2022-07-04 19:30 by MirZa