User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
todo [2019-10-30 00:42] – formatted roundup archive as table MirZatodo [2019-10-30 00:54] – moved done tasks out of list MirZa
Line 59: Line 59:
 | 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 | | 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 |
 | 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 | | 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 |
-| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 | 
 | 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 | | 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 |
 | 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 | | 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 |
 | 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 | | 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 |
-| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 | 
-| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 | 
-| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 | 
-| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 | 
-| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 | 
 | 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 | | 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 |
-| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 | 
 | 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 | | 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 |
 | 18 | 2018-01-04.22:31:50 | Dismantle digital waterfall | 3 | None | 5 | | 18 | 2018-01-04.22:31:50 | Dismantle digital waterfall | 3 | None | 5 |
 | 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 | | 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 |
 | 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 | | 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 |
-| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 | 
-| 76 | 2019-06-09.10:00:41 | NFC tool lockers | 3 | None | 3 | 
-| 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 | 
 | 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 | | 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 |
 | 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 | | 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 |
Line 82: Line 72:
 | 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 | | 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 |
 | 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 | | 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 |
-| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 | 
 | 20 | 2018-01-26.14:54:24 | Deploy Loomio for trial | 3 | 3 | 3 | | 20 | 2018-01-26.14:54:24 | Deploy Loomio for trial | 3 | 3 | 3 |
 | 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 | | 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 |
-| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 | 
 | 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 | | 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 |
 | 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 | | 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 |
 | 47 | 2018-04-28.15:54:46 | Test/fix reflow oven | 4 | None | 3 | | 47 | 2018-04-28.15:54:46 | Test/fix reflow oven | 4 | None | 3 |
 | 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 | | 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 |
-| 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 | 
 | 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 | | 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 |
-| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 | 
-| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 | 
 | 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 | | 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 |
 | 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 | | 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 |
-| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 | 
 | 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 | | 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 |
 | 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 | | 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 |
 | 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 | | 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 |
 +| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 |
 +| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 |
 +| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 |
 +| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 |
 +
 +(Mostly) Done tasks
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 |
 +| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 |
 +| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 |
 +| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 |
 +| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 |
 +| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 |
 +| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 |
 +| 76 | 2019-06-09.10:00:41 | NFC tool lockers | 3 | None | 3 |
 +| 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 |
 +| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 |
 +| 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki