User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
todo [2019-10-30 00:54] – moved done tasks out of list MirZatodo [2020-01-30 12:40] just_ben1996
Line 10: Line 10:
   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).
   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).
-  * Move G6 (Al's room) access point to G11. 
  
  
Line 19: Line 18:
   * Pull additional Cat5 cables from between G11 and G14.   * Pull additional Cat5 cables from between G11 and G14.
   * Specify and purchase shelving for G14 (full-lengths, 300mm depth).   * Specify and purchase shelving for G14 (full-lengths, 300mm depth).
-  * Install spur for G1 water heater. 
   * Tidy-up the radio corner.   * Tidy-up the radio corner.
 ===== Infrastructure Projects ===== ===== Infrastructure Projects =====
Line 88: Line 86:
 | 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 | | 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 |
 | 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 | | 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 |
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 |
  
 (Mostly) Done tasks (Mostly) Done tasks
Line 101: Line 100:
 | 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 | | 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 |
 | 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 | | 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
-| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 | 
 | 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 | | 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki