todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2020-06-07 21:14] – [Roundup] MirZa | todo [2022-02-04 22:10] – MirZa | ||
---|---|---|---|
Line 9: | Line 9: | ||
* Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. | ||
* G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | ||
- | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | ||
Line 19: | Line 18: | ||
* Specify and purchase shelving for G14 (full-lengths, | * Specify and purchase shelving for G14 (full-lengths, | ||
* Tidy-up the radio corner. | * Tidy-up the radio corner. | ||
+ | * Fix Volume control / MQTT-IR bridge | ||
+ | * Fix Projector control | ||
+ | |||
+ | |||
===== Infrastructure Projects ===== | ===== Infrastructure Projects ===== | ||
Line 36: | Line 39: | ||
This schematic might help: http:// | This schematic might help: http:// | ||
+ | |||
+ | ==== Repair G1 Radio ==== | ||
+ | * replacing broken power supply with external one | ||
===== Other Stuff ===== | ===== Other Stuff ===== |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa