This is an old revision of the document!
Table of Contents
To-Do (How can I help?)
See also Roundup and the Members' Nights list.
Small Tasks
These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
- Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies.
- G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).
- Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).
- Wire-up LEDs for one remaining tool locker.
- Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip).
- Install a locker controller and LED in the battery-charging compartment.
Bigger Tasks
These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
- Pull
43 CAT5e cables from G11 rack to G14and install the access point. Fit twin-slot shelf rails in G14.
Infrastructure Projects
More tasks may be found on the infrastructure project pages.
Mini Projects
Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here.
Repair Tektronix oscilloscope
Scope has a power supply fault, and probably needs a capacitor replacement.
Repair Rigol DS1102D oscilloscope
One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.
This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
Other Stuff
- Design a test pattern for checking/calibrating the laser cutter
- Build a webapp to view Space API data