User Tools

Site Tools


waterfall

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
waterfall [2014-04-17 16:03] – [challenge: Lasercutter] janewaterfall [2014-04-18 19:09] jane
Line 6: Line 6:
 Grave produced a The [[http://rebus.hydrus.uberspace.de/edinburghhacklab/General%20Holder%201%20-%205mm%20acrylic.DXF |linked file]]. It contains a pattern that needs to nest on an acrylic sheet 300mm x 620mm. Grave produced a The [[http://rebus.hydrus.uberspace.de/edinburghhacklab/General%20Holder%201%20-%205mm%20acrylic.DXF |linked file]]. It contains a pattern that needs to nest on an acrylic sheet 300mm x 620mm.
 Find a way to setup the pieces that a maximum number, can be fitted on to sheet. We need to cut on our laser cutter 250 pieces of it.  Find a way to setup the pieces that a maximum number, can be fitted on to sheet. We need to cut on our laser cutter 250 pieces of it. 
-For production we just have four full sheet and one small smaller sheet in stock.+For production we just have four full sheet and two smaller sheet in stock.
 Smaller sheet: at least 300mm x 500 mm (Plus 80mm x 120mm) Smaller sheet: at least 300mm x 500 mm (Plus 80mm x 120mm)
  
-problem: inkscape v0.48 displays each piece as 210.140mm x 157.726mm : waiting on size conformation +problem: inkscape v0.48 displays each piece as 210.140mm x 157.726mm :  
- +confirmed: Max length - 61.5mm, Max width 46.15mm 
 + 
 +The file saved on jane's kay folder has duplicated elements stacked over each other in it.  
 +[[http://rebus.hydrus.uberspace.de/edinburghhacklab/close-pattern-test-1generalHolder%205mm%20acrylic.dxf |This .dxf file should be have no overlapping layer on it and can be used by the laser cutter software.]] 
 + 
 +[[ http://rebus.hydrus.uberspace.de/edinburghhacklab/close-pattern-test-1generalHolder%205mm%20acrylic.svg |Here is the Inkscape file for trouble shooting.]]
 ====== challenge: Trough Construction ====== ====== challenge: Trough Construction ======
  
Line 27: Line 32:
 ====== challenge: Frame Construction ====== ====== challenge: Frame Construction ======
  
-A frame needs to be built to hold the waterfall. Currently the idea is to make the 4 black shelving stands (currently in the storeroom) into two A-frames. Each A-frame would be made by tilting 2 stands towards each other and bracing horizontally. These then have to be joined together at a fixed distance of > 2.1m (the length of the waterfall itself).+A frame needs to be built to hold the waterfall. Currently the idea is to make the 4 black shelving stands (currently in the storeroom) into two A-frames. Each A-frame would be made by tilting 2 stands towards each other and bracing horizontally. These then have to be joined together at a fixed distance of > 2.1m (the length of the waterfall itself).  
 + 
 + 
 + 
 + 
 +{{:waterfall_sketch.png?200|}} 
waterfall.txt · Last modified: 2015-10-05 15:55 by 127.0.0.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki