waterfall
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
waterfall [2014-04-17 18:18] – gkane | waterfall [2014-04-17 18:18] – [challenge: Frame Construction] gkane | ||
---|---|---|---|
Line 31: | Line 31: | ||
A frame needs to be built to hold the waterfall. Currently the idea is to make the 4 black shelving stands (currently in the storeroom) into two A-frames. Each A-frame would be made by tilting 2 stands towards each other and bracing horizontally. These then have to be joined together at a fixed distance of > 2.1m (the length of the waterfall itself). | A frame needs to be built to hold the waterfall. Currently the idea is to make the 4 black shelving stands (currently in the storeroom) into two A-frames. Each A-frame would be made by tilting 2 stands towards each other and bracing horizontally. These then have to be joined together at a fixed distance of > 2.1m (the length of the waterfall itself). | ||
+ | |||
+ | |||
+ | |||
+ | |||
{{: | {{: | ||
waterfall.txt · Last modified: 2015-10-05 15:55 by 127.0.0.1