g14_setup
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
g14_setup [2019-08-05 10:07] – tim | g14_setup [2019-08-31 22:21] – [Shelves] tim | ||
---|---|---|---|
Line 5: | Line 5: | ||
These tasks can be started now: | These tasks can be started now: | ||
- | * Order/ | + | * < |
+ | * < | ||
+ | * Shelves (see below) | ||
+ | * <del>Order/ | ||
* Run 4 cat5 cables from G11 rack to G14 roof space | * Run 4 cat5 cables from G11 rack to G14 roof space | ||
- | * < | ||
- | * < | ||
- | * Fit benches | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * Install more battens to support the worktop corner/edge [only if needed] | ||
- | * Find wood to make shelves (mostly 30cm depth, but some deeper for the PSU and function generator) | ||
* Sort/ | * Sort/ | ||
+ | * < | ||
+ | * < | ||
+ | * < | ||
+ | * Obtain some chairs (3-4, computer operator chairs or " | ||
===== Shelves ===== | ===== Shelves ===== | ||
Line 32: | Line 26: | ||
To the left of the window: | To the left of the window: | ||
- | * 150cm x 54cm (for the function generator and HP power supply) | + | * < |
- | * 150cm x 25-30cm (for oscilloscope, | + | * <del>150cm x 25-30cm (for oscilloscope, |
On the long wall: | On the long wall: | ||
Line 42: | Line 36: | ||
To the right of the sink, attached to wall and sink unit: | To the right of the sink, attached to wall and sink unit: | ||
- | * Recessed shelf for PCB etch tank. | + | * <del>Recessed shelf for PCB etch tank</ |