User Tools

Site Tools


g1_flooring

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
g1_flooring [2019-06-22 08:01] – [Volunteers & Shifts] Simong1_flooring [2019-07-02 10:37] tim
Line 3: Line 3:
 The flooring in G1 is rapidly deteriorating. At the 2019 AGM, it was decided that the floor needs to be fixed: Alfie was appointed to organise fixing the floor in G1, which means deciding how to fix it and wrangling members into fixing it.   The flooring in G1 is rapidly deteriorating. At the 2019 AGM, it was decided that the floor needs to be fixed: Alfie was appointed to organise fixing the floor in G1, which means deciding how to fix it and wrangling members into fixing it.  
  
-Alfie knows next to nothing about floors, so this wiki page chronicles Alfie Learning These Things And Fixing The Floor, Hopefully. +Alfie knows next to nothing about floors, so this wiki page chronicles Alfie Learning These Things And Fixing The Floor, Hopefully
 + 
 +Floor area 9.1x4.2m = 38.22m².
  
 ====== THE PLAN ====== ====== THE PLAN ======

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki