g1_flooring
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
g1_flooring [2019-06-22 08:01] – [Volunteers & Shifts] Simon | g1_flooring [2019-07-02 10:37] – tim | ||
---|---|---|---|
Line 3: | Line 3: | ||
The flooring in G1 is rapidly deteriorating. At the 2019 AGM, it was decided that the floor needs to be fixed: Alfie was appointed to organise fixing the floor in G1, which means deciding how to fix it and wrangling members into fixing it. | The flooring in G1 is rapidly deteriorating. At the 2019 AGM, it was decided that the floor needs to be fixed: Alfie was appointed to organise fixing the floor in G1, which means deciding how to fix it and wrangling members into fixing it. | ||
- | Alfie knows next to nothing about floors, so this wiki page chronicles Alfie Learning These Things And Fixing The Floor, Hopefully. | + | Alfie knows next to nothing about floors, so this wiki page chronicles Alfie Learning These Things And Fixing The Floor, Hopefully. |
+ | |||
+ | Floor area 9.1x4.2m = 38.22m². | ||
====== THE PLAN ====== | ====== THE PLAN ====== |