====== G1 Refurbishment ====== | ====== G1 Refurbishment ====== | ||
- | The general plan of refurbishment of G1 (the main room) is to make it suitable for larger groups of people. It is also desirable to create both, working | + | The general plan of refurbishment of G1 (the main room) is to make it nicer and more welcoming. |
+ | |||
+ | ==== See Also ==== | ||
+ | * [[whatwouldmakethishacklabawesome|What would make hacklab awesome]] | ||
+ | * [[g1_lighting|Main Room (G1) Lighting Refit]] | ||
+ | * [[bikeshed|]] | ||
{{: | {{: | ||
- | ==== Decision making section ==== | ||
- | |||
- | |||
- | [[https:// | ||
- | |||
- | |||
- | ==== Planning and timing section ==== | ||
- | |||
- | It involves the following stages with a very optimistic estimate of time: | ||
- | |||
- | | ||
- | |||
- | 1. move all the stuff out or G1 e-recycling waste – 0.5day - done | ||
- | 2. get rid of TV stand – 0.5day - done | ||
- | 3. remove the large flat table from the middle of the room - 1day | ||
- | 4. Decide which linoleum to get – 3 days | ||
- | 5. Remove the cupboard from G1 and probably turn it into a members box holder in G11 1 day + place for keeping it – 1.5 days | ||
- | 6. remove all the floor - 1day | ||
- | |||
- | Resources necessary: 5.5days of 2-3 people and 2 days of 4 people | ||
- | |||
- | Flooring stage | ||
- | |||
- | 1. Buy all the glue, plaster, paint and linoleum and store it in the corridor – 2days max | ||
- | 2. prepare the floor with all necessary plastering, leveling and stuff. - 2 days 4-5 people | ||
- | 3. Glue the linoleum to the floor – 2-3 days 4-5 people | ||
- | 4. Prettify all the bits and bobs – 2-3 days 2-3 people | ||
- | |||
- | Resources necessary: 2days of 1-2persons after that 4-5days of 4-5 people and 2-3 days of 2-3 people | ||
- | |||
- | Furniture stage | ||
- | |||
- | 1. Turn the FM station to the other wall and add small tools and soldering corner – 1 day | ||
- | 2. Make or buy the hexagonal tables - 3days | ||
- | 3. Make or buy the divider shelf and mounts - 1-2days | ||
- | 4. Make the electronic components, enterntainment, | ||
- | | ||
- | Resources necessary: 1day of 1-2 person, 3 days of 2people, 1-2days of 2 people, 2-3 days of 2-3 people. | ||
- | |||
- | |||
- | |||
- | |||
- | ==== Some floor options ==== | ||
- | |||
- | G1 has 40sq meter area max | ||
- | |||
- | |||
- | |||
- | Garage flooring tiles - fixable, water-resistant, | ||
- | |||
- | cost £30-35 per sq meter inc VAT = total £1200-1400 | ||
- | |||
- | https:// | ||
- | {{: | + | ==== Planning ==== |
+ | === The Plan™ === | ||
+ | Get the floor done while the lab is closed. Rip almost everything out of G1. Move in only the necessary bits. | ||
+ | === 2do === | ||
- | Linoleum | + | |
+ | * <del> Move everything out of the room (includes clearing the fridge, dishwasher etc.)</ | ||
+ | * < | ||
+ | * < | ||
+ | * Remove small projector & shelves - Marcin | ||
+ | * Clean floor | ||
+ | * < | ||
+ | * < | ||
+ | * Remove desk supports | ||
+ | * Remove lino skirting | ||
+ | - Inspect new shiny floor - everyone | ||
+ | - Order/make new tables - Costa | ||
+ | - Find a second sofa | ||
+ | - Find a coffee table | ||
+ | - Find nice chairs | ||
+ | - Figure out separator/ | ||
+ | - Order & hang notice board - Marcin | ||
+ | - Clean up walls | ||
+ | - Paint pipes and radiators and such to match walls | ||
+ | - Figure out better kitchen: | ||
+ | * Cupboards | ||
+ | * Utensils | ||
+ | * Move everything into one box | ||
+ | * Only communal cooking allowed for now | ||
+ | - Find (maybe) a designer to help - Marcin | ||
+ | - Research improving ventilation | ||
+ | - Remove wood strip from wall | ||
+ | - ??? | ||
- | cost £19 per sq meter exc VAT = total £800-1000 | + | === Questions === |
- | https:// | + | * How do we organise work to maintain social distancing? |
+ | * Should we have a mezzanine? | ||
+ | * Should we get a new projector screen (or fix old one)? | ||
- | {{:: | + | === Cool ideas === |
+ | * Project show-off gallery | ||
+ | * Figure out a theme | ||
+ | * Outside hacking space | ||
+ | === Theme ideas === | ||
- | Laminate flooring | + | * Marine |
+ | * Forest | ||
+ | * Cyberpunk | ||
+ | * Solarpunk | ||
+ | * Summer | ||
+ | * Laboratory | ||
+ | * Small animal hospital | ||
+ | * Zoo | ||
+ | * Tea house | ||
+ | * Steampunk | ||
+ | * Tardis! | ||
- | cost £14 per sq meter inc VAT = total £560 | + | === Design Goals === |
- | https:// | + | What are we actually trying to achieve with the design? |
- | {{:harbour-oak-kronotex-laminate-2.jpg? | + | * Comfortable |
+ | * Welcoming | ||
+ | * Friendly | ||
+ | * Hackable | ||
+ | * Accessible | ||
+ | * Sensory needs - sound and light control | ||
+ | * Quiet / social retreat space | ||
+ | * Usable for: | ||
+ | * Communal meals | ||
+ | * Watching films | ||
+ | * Computering | ||
+ | * Soldering / social compatible electronics | ||
+ | === How to make G1 Friendly === | ||
- | Carpet tiles - absorbs spilled liquid | + | * Should be a place where you'd feel comfortable recording |
+ | * Place where you could take off your shoes | ||
+ | * Place where people want to come back | ||
+ | * Rugs in the lounge area | ||
- | £10 per sq meter inc VAT = total £400. | + | === Meetings === |
- | https:// | + | ==== 07/03 ==== |
- | {{:commercial-carpet-tiles-stebro-flooring-office-flooring.jpg? | + | Agenda: |
+ | * Status update - Marcin | ||
+ | * Covering up pipes project | ||
+ | * New heaters? | ||
+ | * ??? | ||
- | ==== Furniture | + | ==== Cost ==== |
+ | - Floor: 1602 | ||
- | Ikea Kallax Shelving unit - 182x182cm £150 | ||
- | https:// | ||
- | {{: |