User Tools

Site Tools


members_nights

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
members_nights [2019-05-21 13:07] timmembers_nights [2020-02-29 11:15] (current) – [Dates] alfie
Line 17: Line 17:
 Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it. Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it.
  
-| **Saturday 25th May3pm** +| **Thursday 12th March7pm** | 
-| Thursday 6th June, 7pm +| Saturday 21st March, 3pm |
-| Saturday 22nd June, 3pm +
-| ... |+
  
 ===== Activity Ideas ===== ===== Activity Ideas =====
  
   * Major infrastructure projects   * Major infrastructure projects
-    * [[laserchimney|Fume extraction for laser cutters]] 
     * [[toollockers|NFC-enabled Tool Lockers]]     * [[toollockers|NFC-enabled Tool Lockers]]
-    * Layout changes in G1 (main room) +    * [[g1_layout|Layout changes in G1 (main room)]] 
-    * New central workbench in G8 (workshop)+    * [[workshop_island|New central workbench in G8 (workshop)]]
  
   * Main Room   * Main Room
Line 43: Line 40:
     * Radio Corner:     * Radio Corner:
       * Tidy-up and reduce the footprint of the radio corner       * Tidy-up and reduce the footprint of the radio corner
-      * Install decent RF earth (pipework?)+      * Install decent RF earth(pipework?) 
 +      * Finish putting the Icom radio back together 
 +      * Make a microphone cable for the Icom 
 +      * Make a SignaLink cable for the Icom
  
   * Workshop   * Workshop
Line 51: Line 51:
     * Sort the junk pile underneath the CNC router     * Sort the junk pile underneath the CNC router
     * Organise the boxes of power tools (small and closed boxes instead of a single pile)     * Organise the boxes of power tools (small and closed boxes instead of a single pile)
 +    * <del>Make a rack for large timber stock</del>
     * Safety training docs for table saw     * Safety training docs for table saw
     * Safety training docs for mitre saw     * Safety training docs for mitre saw
Line 67: Line 68:
   * Install a new antenna mounting frame on the roof   * Install a new antenna mounting frame on the roof
  
-Look for more ideas at https://roundup.ehlab.uk/+  * Cleaning Party! (proposed themed session) 
 +    * //This is an idea proposed by alfie// 
 +    * The lab is a mess. Let's have a cleaning party to tidy it up.  
 +    * Lab is closed to general use - any members who attend during the cleaning party must participate or go home 
 +    * BIG tidy up 
 +      * Every item on every surface should be picked up and put somewhere sensible 
 +        * The sensible place for clutter is in the bin - ruthlessness is key. 
 +      * Sort  
 +      * Bribe some members with cars to take some clutter/e-waste to the dump (bribes to be decided)  
 +    * Deep clean 
 +      * hoover every flat surface 
 +      * mop all the floors 
 +      * bleach & scrub work surfaces 
 +      * clean tables / food prep area 
 +    * Lab buys pizza afterwards for everyone who contributed? maybe? there needs to be an incentive otherwise people just won't get involved  
 + 
 + 
 +Look for more ideas at [[todo|To-Do (How can I help?)]].
  
members_nights.1558444054.txt.gz · Last modified: 2019-05-21 13:07 by tim

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki