todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-10-07 14:00] – tim | todo [2019-09-01 16:49] – [Small Tasks] tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also [[https:// |
- | ==== Drill organisation | + | ===== Small Tasks ===== |
- | All of our drills (bits) currently sit in a single | + | These should be immediately actionable, describable |
- | * Make or buy an organiser: | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | * G1 hifi shelves: replace the short brackets with long brackets |
- | * Sections for HSS, brad-point and masonry | + | * Laser Cutter #1: Connect |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | * Move G6 (Al's room) access point to G11. |
- | * Identify a suitable drill sharpening system | + | |
- | ==== Install ventilation in G8 Workshop ==== | ||
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | + | ===== Bigger Tasks ===== |
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | + | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: |
- | * Source | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | * Pull additional Cat5 cables from between G11 and G14. |
+ | * Specify and purchase shelving for G14 (full-lengths, | ||
+ | * Install spur for G1 water heater. | ||
+ | * Tidy-up the radio corner. | ||
+ | ===== Infrastructure Projects ===== | ||
- | The extract vent is currently located in the left corner as you enter the room. It should | + | More tasks may be found on the [[start# |
- | ==== Finish moving the workshop from G2 to G8 ==== | + | ===== Mini Projects ===== |
- | * Mount the wall-mounted bins in G8 | + | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. |
- | * Move the tools and supplies from G2 to G8 | + | |
- | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | + | |
- | * Move the chemicals | + | |
- | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | + | |
- | ===== Other Stuff ===== | + | ==== Repair Tektronix oscilloscope |
- | * Design | + | Scope has a power supply fault, |
- | * Update OpenStreepMap to identify all the local takeaways | + | |
- | * Sort the PC parts and peripherals | + | |
- | * Build a webapp to view [[http:// | + | |
- | ===== Completed Projects ===== | + | ==== Repair Rigol DS1102D oscilloscope |
- | ==== Fit shelving under G8 workbenches ==== | + | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. |
- | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | + | This schematic might help: http:// |
+ | ===== Other Stuff ===== | ||
+ | |||
+ | * Design a test pattern for checking/ | ||
+ | * Build a webapp to view [[http:// | ||
todo.txt · Last modified: 2022-07-04 19:30 by MirZa