User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
todo [2025-02-16 21:03] – [Bigger Tasks] ariatodo [2025-07-05 18:00] (current) aria
Line 1: Line 1:
 ====== To-Do (How can I help?) ====== ====== To-Do (How can I help?) ======
- 
-See also the [[members_nights|Members' Nights]] list. 
  
 ===== Small Tasks ===== ===== Small Tasks =====
Line 8: Line 6:
  
   * Sort out rails (shelf next to front of rack in G1) and store somewhere more convenient   * Sort out rails (shelf next to front of rack in G1) and store somewhere more convenient
-  * Design a test pattern for checking/calibrating the laser cutter+  * Move wire spools in G14 to where the rest are in G11 
 +  * Sort some of the boxes in G14 into the parts trays 
 +  * Fix the clasp on the sewing box in G14 
 +  * Consolidate printer spares/parts from G2, G11, and G14
  
 ===== Bigger Tasks ===== ===== Bigger Tasks =====
Line 15: Line 16:
  
   * Fix projector control   * Fix projector control
-  * Sort out spare tools (behind rack in G1) and make list on wiki somewhere +  * More stable mount for pattern projector 
-  * Build a webapp to view [[http://spaceapi.net|Space API]] data +  * Test the contents of the speaker/amp graveyard in G2 - figure out what to keep, sell, or bin.
- +
-===== Infrastructure Projects ===== +
   * Add a shelly smart switch to G11 (possibly G14). Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most   * Add a shelly smart switch to G11 (possibly G14). Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most
   * Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it   * Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it
- 
-More tasks may be found on the [[start#projects|infrastructure project pages]]. 
  
 ===== Mini Projects ===== ===== Mini Projects =====
Line 39: Line 35:
 This schematic might help: http://rigol.codenaschen.de/index.php/Schematics This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
  
-=== Repair / Improve filament recycler  === 
- 
-The filament recycler we used to use for [[plasticrecycling|plastic recycling]] is broken, and also not very good apparently. It should either be repaired or replaced. 
  
 ===== Other Stuff ===== ===== Other Stuff =====
Line 49: Line 42:
 https://wiki.ehlab.uk/roof https://wiki.ehlab.uk/roof
 https://wiki.ehlab.uk/radio:projects https://wiki.ehlab.uk/radio:projects
- 
-===== Roundup ===== 
- 
-The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: 
- 
- 
-^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ 
-| 94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 | 
-| 99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 | 
-| 93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 | 
-| 95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 | 
-| 98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 | 
-| 96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 | 
-| 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 | 
-| 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 | 
-| 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 | 
-| 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 | 
-| 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 | 
-| 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 | 
-| 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 | 
-| 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 | 
-| 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 | 
-| 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 | 
-| 9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 | 
-| 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 | 
-| 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 | 
-| 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 | 
-| 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 | 
-| 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 | 
-| 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 | 
-| 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 | 
-| 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 | 
-| 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 | 
-| 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 | 
-| 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 | 
-| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 | 
-| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 | 
-| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 | 
-| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 | 
-| 59 | 2018-02-02.15:45:46 | Replace taps in G8 <del>and G11</del> | 21 | None | 3 | 
- 
-(Mostly) Done tasks 
-^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ 
-| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 | 
-| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 | 
-| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 | 
-| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 | 
-| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 | 
-| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 | 
-| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 | 
-| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 | 
-| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 | 
-| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 | 
todo.txt · Last modified: by aria

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki