todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
todo [2016-10-14 15:57] – [Finish moving the workshop from G2 to G8] tim | todo [2016-10-18 14:25] – tim | ||
---|---|---|---|
Line 20: | Line 20: | ||
* Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | ||
* Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | ||
+ | |||
+ | ==== Repair Tektronix oscilloscope ==== | ||
+ | |||
+ | Scope has a power supply fault, and probably needs a capacitor replacement. | ||
+ | |||
+ | ==== Repair Rigol oscilloscope ==== | ||
+ | |||
+ | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. | ||
+ | |||
+ | This schematic might help: http:// | ||
===== Other Stuff ===== | ===== Other Stuff ===== |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa