User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
todo [2016-10-18 14:25] timtodo [2019-09-01 16:49] – [Small Tasks] tim
Line 1: Line 1:
-====== Things To Do How Can Help? ======+====== To-Do (How can help?======
  
-===== Mini Projects =====+See also [[https://roundup.ehlab.uk/|Roundup]] and the [[members_nights|Members' Nights]] list.
  
-==== Drill organisation ====+===== Small Tasks =====
  
-All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing.+These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-  * Make or buy an organiser: +  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. 
-    Multiple holes for each size of drill (because one drill of each size is not enough for hackerspace) +  G1 hifi shelves: replace the short brackets with long brackets (we have surplus and the shelf would be more secure). 
-    * Sections for HSS, brad-point and masonry +  * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc)
-  * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/spares+  * Move G6 (Al's room) access point to G11.
-  * Identify a suitable drill sharpening system to keep the drills in good condition.+
  
-==== Finish moving the workshop from G2 to G8 ==== 
  
-  * Clean the blue storage bins in G8 +===== Bigger Tasks ===== 
-  * Move the tools and supplies from G2 to G8 + 
-  * Organise the shelves in G8label them so tools can be returned to the same place each time+These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: 
-  * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers+ 
-  * Fit smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall).+  * Pull additional Cat5 cables from between G11 and G14. 
 +  * Specify and purchase shelving for G14 (full-lengths300mm depth)
 +  * Install spur for G1 water heater
 +  * Tidy-up the radio corner. 
 +===== Infrastructure Projects ===== 
 + 
 +More tasks may be found on the [[start#projects|infrastructure project pages]]. 
 + 
 +===== Mini Projects ===== 
 + 
 +Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and link from here.
  
 ==== Repair Tektronix oscilloscope ==== ==== Repair Tektronix oscilloscope ====
Line 25: Line 33:
 Scope has a power supply fault, and probably needs a capacitor replacement. Scope has a power supply fault, and probably needs a capacitor replacement.
  
-==== Repair Rigol oscilloscope ====+==== Repair Rigol DS1102D oscilloscope ====
  
 One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.
Line 34: Line 42:
  
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
-  * Update OpenStreepMap to identify all the local takeaways 
-  * Sort the PC parts and peripherals 
   * Build a webapp to view [[http://spaceapi.net|Space API]] data   * Build a webapp to view [[http://spaceapi.net|Space API]] data
- 
----- 
- 
-===== Completed Projects ===== 
- 
-==== Fit shelving under G8 workbenches ==== 
- 
-We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. 
- 
-==== Relocate extraction vent in G11 Store Room ==== 
- 
-The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. 
- 
-==== Install ventilation in G8 Workshop ==== 
- 
-We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. 
- 
-  * Plan how to remove the bricks safely and without damaging the rest of the wall. 
-  * Source a suitable fan. 
-  * Do the work... 
-  * Clean/repaint as required. 
- 
  
todo.txt · Last modified: 2022-07-04 19:30 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki