todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
todo [2019-07-09 12:19] – tim | todo [2019-07-18 13:26] – [Bigger Tasks] tim | ||
---|---|---|---|
Line 13: | Line 13: | ||
These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: | ||
- | * Pull 4 CAT5e cables from G11 rack to G14 and install the access point. | + | * Pull 4 CAT5e cables from G11 rack to G14 <del>and install the access point.</ |
===== Infrastructure Projects ===== | ===== Infrastructure Projects ===== |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa