todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
todo [2019-08-31 22:19] – [Small Tasks] tim | todo [2019-09-01 16:49] – [Small Tasks] tim | ||
---|---|---|---|
Line 10: | Line 10: | ||
* G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | ||
* Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | ||
- | * Wire-up LEDs for one remaining tool locker. | ||
- | * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | ||
* Move G6 (Al's room) access point to G11. | * Move G6 (Al's room) access point to G11. | ||
todo.txt · Last modified: 2022-07-04 19:30 by MirZa