User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
todo [2019-08-31 22:19] – [Small Tasks] timtodo [2019-09-01 16:49] – [Small Tasks] tim
Line 10: Line 10:
   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).
   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).
-  * Wire-up LEDs for one remaining tool locker. 
-  * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). 
   * Move G6 (Al's room) access point to G11.   * Move G6 (Al's room) access point to G11.
  
todo.txt · Last modified: 2022-07-04 19:30 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki