User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
todo [2019-08-31 22:19] – [Small Tasks] timtodo [2019-09-22 16:06] tim
Line 1: Line 1:
 ====== To-Do (How can I help?) ====== ====== To-Do (How can I help?) ======
  
-See also [[https://roundup.ehlab.uk/|Roundup]] and the [[members_nights|Members' Nights]] list.+See also the [[members_nights|Members' Nights]] list.
  
 ===== Small Tasks ===== ===== Small Tasks =====
Line 10: Line 10:
   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).
   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).
-  * Wire-up LEDs for one remaining tool locker. 
-  * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). 
   * Move G6 (Al's room) access point to G11.   * Move G6 (Al's room) access point to G11.
  
Line 45: Line 43:
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
   * Build a webapp to view [[http://spaceapi.net|Space API]] data   * Build a webapp to view [[http://spaceapi.net|Space API]] data
 +
 +===== Roundup =====
 +
 +The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:
 +
 +<file>
 +id,activity,title,creator,assignedto,status
 +94,2018-06-03.16:36:02,COSHH Register / Chemicals,22,None,3
 +99,2018-06-03.10:17:27,Fire safety policy,22,None,3
 +93,2018-06-03.10:09:49,Update health and safety policy,22,None,3
 +95,2018-06-03.10:05:17,Near miss / accident register & policy,22,None,3
 +98,2018-06-03.09:31:42,Electrical Testing / PAT Testing policy / training,22,22,3
 +96,2018-06-03.09:21:59,Electrical Safety Policy,22,None,3
 +54,2017-12-08.15:50:13,Create training docs for mitre saw,4,None,1
 +52,2017-12-08.15:49:11,Create training docs for table saw,4,None,1
 +39,2019-03-09.18:45:32,"Update ""Facilities"" page on the website",19,None,3
 +56,2018-08-04.18:02:06,Create training docs for bantam lathe,4,None,3
 +17,2018-06-28.15:45:34,Tidy roof radio/network equipment,3,None,3
 +73,2018-04-27.12:15:35,Maintenance on Block B roof ladder,3,None,1
 +88,2018-04-24.18:02:49,Set up PC for the CNC router,4,None,1
 +87,2018-04-24.18:00:42,CNC router z-axis counterweight or brake,4,None,1
 +85,2018-04-24.17:56:03,CNC router dust extraction,4,None,1
 +84,2018-04-24.17:55:39,CNC router power/e-stop wiring,4,None,3
 +82,2018-04-24.17:47:53,Watercooling for the CNC router,4,None,1
 +79,2018-04-14.20:48:15,Fix Ultimaker 2 LED Strips,23,None,1
 +70,2018-01-26.03:13:28,Fix CNC spindle probe,4,4,5
 +11,2018-01-19.00:04:51,Repair Tektronix oscilloscope,3,None,3
 +18,2018-01-04.22:31:50,Dismantle digital waterfall,3,None,5
 +33,2017-06-28.00:23:48,Organise chemical storage and COSHH docs,3,None,1
 +32,2017-06-27.23:46:31,Organise cleaning cupboard,3,None,1
 +4,2017-04-24.14:00:20,Fix the NovaTurn CNC lathe,4,None,1
 +76,2019-06-09.10:00:41,NFC tool lockers,3,None,3
 +21,2018-06-03.18:42:30,Tool access controllers,3,3,5
 +97,2018-06-03.09:28:59,Membership Policy,21,21,1
 +28,2018-05-22.09:46:27,Close out the milling pledge,4,None,5
 +9,2018-05-22.09:46:13,Collect remaining mitre saw pledges,3,None,5
 +67,2018-05-01.19:57:43,Remote antenna switch for roof->g1 downlink,3,None,3
 +89,2018-04-25.13:30:09,Mailman 3 mailing lists,3,3,3
 +24,2018-04-13.09:54:56,Automated do-not-hack stickers,3,3,3
 +20,2018-01-26.14:54:24,Deploy Loomio for trial,3,3,3
 +104,2019-05-17.14:30:44,(Sliding) doors under benches in G8,45,None,1
 +102,2019-03-23.11:45:06,test subject,3,3,3
 +63,2018-12-18.14:30:07,Build new test lead organisation fixture,23,None,3
 +69,2018-07-18.13:23:09,SatNOGS station,3,None,3
 +47,2018-04-28.15:54:46,Test/fix reflow oven,4,None,3
 +92,2018-04-27.12:10:08,Name Badge Printer / Visitor Sign In,22,None,1
 +91,2018-04-27.12:03:35,Hot Water for G1,3,None,3
 +90,2018-04-25.14:42:53,Consumables Inventory,23,None,3
 +83,2018-04-24.18:17:54,Spindle/VFD control from LinuxCNC,4,None,1
 +86,2018-04-24.18:17:45,Tool touchoff pad for the CNC router,4,None,1
 +61,2018-03-31.05:57:11,Build new terminal unit for HP bench power supply,3,None,3
 +26,2018-03-03.01:07:58,Install roof-top weather station,3,10,3
 +59,2018-02-02.15:45:46,Replace taps in G8 and G11,21,None,3
 +60,2018-01-25.15:21:14,Obtain BNC cables and such for Oscilloscope/Signal Generators,23,None,3
 +58,2018-01-03.00:14:14,Purchase vacuum desoldering pump,3,None,1
 +30,2017-06-11.16:09:24,3D Printing Supplies,15,15,1
 +</file>
  
todo.txt · Last modified: 2022-07-04 19:30 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki