User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
todo [2019-09-01 16:49] – [Small Tasks] timtodo [2020-01-30 12:40] just_ben1996
Line 1: Line 1:
 ====== To-Do (How can I help?) ====== ====== To-Do (How can I help?) ======
  
-See also [[https://roundup.ehlab.uk/|Roundup]] and the [[members_nights|Members' Nights]] list.+See also the [[members_nights|Members' Nights]] list.
  
 ===== Small Tasks ===== ===== Small Tasks =====
Line 10: Line 10:
   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).
   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).
-  * Move G6 (Al's room) access point to G11. 
  
  
Line 19: Line 18:
   * Pull additional Cat5 cables from between G11 and G14.   * Pull additional Cat5 cables from between G11 and G14.
   * Specify and purchase shelving for G14 (full-lengths, 300mm depth).   * Specify and purchase shelving for G14 (full-lengths, 300mm depth).
-  * Install spur for G1 water heater. 
   * Tidy-up the radio corner.   * Tidy-up the radio corner.
 ===== Infrastructure Projects ===== ===== Infrastructure Projects =====
Line 44: Line 42:
   * Build a webapp to view [[http://spaceapi.net|Space API]] data   * Build a webapp to view [[http://spaceapi.net|Space API]] data
  
 +===== Roundup =====
 +
 +The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:
 +
 +
 +
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 |
 +| 99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 |
 +| 93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 |
 +| 95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 |
 +| 98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 |
 +| 96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 |
 +| 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 |
 +| 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 |
 +| 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 |
 +| 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 |
 +| 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 |
 +| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 |
 +| 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 |
 +| 18 | 2018-01-04.22:31:50 | Dismantle digital waterfall | 3 | None | 5 |
 +| 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 |
 +| 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 |
 +| 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 |
 +| 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 |
 +| 9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 |
 +| 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 |
 +| 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 |
 +| 20 | 2018-01-26.14:54:24 | Deploy Loomio for trial | 3 | 3 | 3 |
 +| 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 |
 +| 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 |
 +| 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 |
 +| 47 | 2018-04-28.15:54:46 | Test/fix reflow oven | 4 | None | 3 |
 +| 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 |
 +| 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 |
 +| 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 |
 +| 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 |
 +| 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 |
 +| 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 |
 +| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 |
 +| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 |
 +| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 |
 +| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 |
 +| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 |
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 |
 +
 +(Mostly) Done tasks
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 |
 +| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 |
 +| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 |
 +| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 |
 +| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 |
 +| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 |
 +| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 |
 +| 76 | 2019-06-09.10:00:41 | NFC tool lockers | 3 | None | 3 |
 +| 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 |
 +| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
 +| 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki