Line 10: Line 10:
   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).
   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).
-  * Move G6 (Al's room) access point to G11. 
  
  
Line 19: Line 18:
   * Pull additional Cat5 cables from between G11 and G14.   * Pull additional Cat5 cables from between G11 and G14.
   * Specify and purchase shelving for G14 (full-lengths, 300mm depth).   * Specify and purchase shelving for G14 (full-lengths, 300mm depth).
-  * Install spur for G1 water heater. 
   * Tidy-up the radio corner.   * Tidy-up the radio corner.
 ===== Infrastructure Projects ===== ===== Infrastructure Projects =====
Line 48: Line 46:
 The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:
  
-<file> 
-id,activity,title,creator,assignedto,status 
-94,2018-06-03.16:36:02,COSHH Register / Chemicals,22,None,3 
-99,2018-06-03.10:17:27,Fire safety policy,22,None,3 
-93,2018-06-03.10:09:49,Update health and safety policy,22,None,3 
-95,2018-06-03.10:05:17,Near miss / accident register & policy,22,None,3 
-98,2018-06-03.09:31:42,Electrical Testing / PAT Testing policy / training,22,22,3 
-96,2018-06-03.09:21:59,Electrical Safety Policy,22,None,3 
-54,2017-12-08.15:50:13,Create training docs for mitre saw,4,None,1 
-52,2017-12-08.15:49:11,Create training docs for table saw,4,None,1 
-39,2019-03-09.18:45:32,"Update ""Facilities"" page on the website",19,None,3 
-56,2018-08-04.18:02:06,Create training docs for bantam lathe,4,None,3 
-17,2018-06-28.15:45:34,Tidy roof radio/network equipment,3,None,3 
-73,2018-04-27.12:15:35,Maintenance on Block B roof ladder,3,None,1 
-88,2018-04-24.18:02:49,Set up PC for the CNC router,4,None,1 
-87,2018-04-24.18:00:42,CNC router z-axis counterweight or brake,4,None,1 
-85,2018-04-24.17:56:03,CNC router dust extraction,4,None,1 
-84,2018-04-24.17:55:39,CNC router power/e-stop wiring,4,None,3 
-82,2018-04-24.17:47:53,Watercooling for the CNC router,4,None,1 
-79,2018-04-14.20:48:15,Fix Ultimaker 2 LED Strips,23,None,1 
-70,2018-01-26.03:13:28,Fix CNC spindle probe,4,4,5 
-11,2018-01-19.00:04:51,Repair Tektronix oscilloscope,3,None,3 
-18,2018-01-04.22:31:50,Dismantle digital waterfall,3,None,5 
-33,2017-06-28.00:23:48,Organise chemical storage and COSHH docs,3,None,1 
-32,2017-06-27.23:46:31,Organise cleaning cupboard,3,None,1 
-4,2017-04-24.14:00:20,Fix the NovaTurn CNC lathe,4,None,1 
-76,2019-06-09.10:00:41,NFC tool lockers,3,None,3 
-21,2018-06-03.18:42:30,Tool access controllers,3,3,5 
-97,2018-06-03.09:28:59,Membership Policy,21,21,1 
-28,2018-05-22.09:46:27,Close out the milling pledge,4,None,5 
-9,2018-05-22.09:46:13,Collect remaining mitre saw pledges,3,None,5 
-67,2018-05-01.19:57:43,Remote antenna switch for roof->g1 downlink,3,None,3 
-89,2018-04-25.13:30:09,Mailman 3 mailing lists,3,3,3 
-24,2018-04-13.09:54:56,Automated do-not-hack stickers,3,3,3 
-20,2018-01-26.14:54:24,Deploy Loomio for trial,3,3,3 
-104,2019-05-17.14:30:44,(Sliding) doors under benches in G8,45,None,1 
-102,2019-03-23.11:45:06,test subject,3,3,3 
-63,2018-12-18.14:30:07,Build new test lead organisation fixture,23,None,3 
-69,2018-07-18.13:23:09,SatNOGS station,3,None,3 
-47,2018-04-28.15:54:46,Test/fix reflow oven,4,None,3 
-92,2018-04-27.12:10:08,Name Badge Printer / Visitor Sign In,22,None,1 
-91,2018-04-27.12:03:35,Hot Water for G1,3,None,3 
-90,2018-04-25.14:42:53,Consumables Inventory,23,None,3 
-83,2018-04-24.18:17:54,Spindle/VFD control from LinuxCNC,4,None,1 
-86,2018-04-24.18:17:45,Tool touchoff pad for the CNC router,4,None,1 
-61,2018-03-31.05:57:11,Build new terminal unit for HP bench power supply,3,None,3 
-26,2018-03-03.01:07:58,Install roof-top weather station,3,10,3 
-59,2018-02-02.15:45:46,Replace taps in G8 and G11,21,None,3 
-60,2018-01-25.15:21:14,Obtain BNC cables and such for Oscilloscope/Signal Generators,23,None,3 
-58,2018-01-03.00:14:14,Purchase vacuum desoldering pump,3,None,1 
-30,2017-06-11.16:09:24,3D Printing Supplies,15,15,1 
-</file> 
  
 +
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 |
 +| 99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 |
 +| 93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 |
 +| 95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 |
 +| 98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 |
 +| 96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 |
 +| 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 |
 +| 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 |
 +| 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 |
 +| 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 |
 +| 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 |
 +| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 |
 +| 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 |
 +| 18 | 2018-01-04.22:31:50 | Dismantle digital waterfall | 3 | None | 5 |
 +| 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 |
 +| 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 |
 +| 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 |
 +| 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 |
 +| 9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 |
 +| 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 |
 +| 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 |
 +| 20 | 2018-01-26.14:54:24 | Deploy Loomio for trial | 3 | 3 | 3 |
 +| 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 |
 +| 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 |
 +| 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 |
 +| 47 | 2018-04-28.15:54:46 | Test/fix reflow oven | 4 | None | 3 |
 +| 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 |
 +| 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 |
 +| 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 |
 +| 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 |
 +| 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 |
 +| 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 |
 +| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 |
 +| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 |
 +| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 |
 +| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 |
 +| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 |
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 |
 +
 +(Mostly) Done tasks
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 |
 +| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 |
 +| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 |
 +| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 |
 +| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 |
 +| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 |
 +| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 |
 +| 76 | 2019-06-09.10:00:41 | NFC tool lockers | 3 | None | 3 |
 +| 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 |
 +| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
 +| 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 |