User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
todo [2019-10-30 00:54] – moved done tasks out of list MirZatodo [2019-10-31 03:02] – [Bigger Tasks] MirZa
Line 21: Line 21:
   * Install spur for G1 water heater.   * Install spur for G1 water heater.
   * Tidy-up the radio corner.   * Tidy-up the radio corner.
 +  * Dismantle tap in G11
 ===== Infrastructure Projects ===== ===== Infrastructure Projects =====
  
Line 88: Line 89:
 | 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 | | 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 |
 | 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 | | 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 |
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 |
  
 (Mostly) Done tasks (Mostly) Done tasks
Line 101: Line 103:
 | 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 | | 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 |
 | 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 | | 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
-| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 | 
 | 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 | | 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki