todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
todo [2019-08-29 15:08] – [Small Tasks] tim | todo [2025-02-16 21:03] (current) – [Bigger Tasks] aria | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== To-Do (How can I help?) ====== | ====== To-Do (How can I help?) ====== | ||
- | See also [[https:// | + | See also the [[members_nights|Members' |
===== Small Tasks ===== | ===== Small Tasks ===== | ||
Line 7: | Line 7: | ||
These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: | These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: | ||
- | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. | + | * Sort out rails (shelf |
- | * G1 hifi shelves: replace the short brackets with long brackets | + | * Design a test pattern |
- | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | + | |
- | * Wire-up LEDs for one remaining tool locker. | + | |
- | * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | + | |
- | * Install a locker controller and LED in the battery-charging compartment. | + | |
- | * Move G6 (Al's room) access point to G11. | + | |
===== Bigger Tasks ===== | ===== Bigger Tasks ===== | ||
Line 20: | Line 14: | ||
These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: | ||
- | * Pull additional Cat5 cables from between G11 and G14. | + | * Fix projector control |
- | * Specify and purchase shelving for G14 (full-lengths, | + | * Sort out spare tools (behind rack in G1) and make list on wiki somewhere |
- | * Install spur for G1 water heater. | + | * Build a webapp to view [[http:// |
- | * Tidy-up the radio corner. | + | |
===== Infrastructure Projects ===== | ===== Infrastructure Projects ===== | ||
+ | |||
+ | * Add a shelly smart switch to G11 (possibly G14). Doesn' | ||
+ | * Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it | ||
More tasks may be found on the [[start# | More tasks may be found on the [[start# | ||
Line 41: | Line 38: | ||
This schematic might help: http:// | This schematic might help: http:// | ||
+ | |||
+ | === Repair / Improve filament recycler | ||
+ | |||
+ | The filament recycler we used to use for [[plasticrecycling|plastic recycling]] is broken, and also not very good apparently. It should either be repaired or replaced. | ||
===== Other Stuff ===== | ===== Other Stuff ===== | ||
- | * Design a test pattern | + | ===== Radio / Antenna TODO ==== |
- | | + | |
+ | https:// | ||
+ | https:// | ||
+ | |||
+ | ===== Roundup ===== | ||
+ | |||
+ | The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: | ||
+ | |||
+ | |||
+ | ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ | ||
+ | | 94 | 2018-06-03.16: | ||
+ | | 99 | 2018-06-03.10: | ||
+ | | 93 | 2018-06-03.10: | ||
+ | | 95 | 2018-06-03.10: | ||
+ | | 98 | 2018-06-03.09: | ||
+ | | 96 | 2018-06-03.09: | ||
+ | | 54 | 2017-12-08.15: | ||
+ | | 52 | 2017-12-08.15: | ||
+ | | 56 | 2018-08-04.18: | ||
+ | | 17 | 2018-06-28.15: | ||
+ | | 73 | 2018-04-27.12: | ||
+ | | 11 | 2018-01-19.00: | ||
+ | | 33 | 2017-06-28.00: | ||
+ | | 32 | 2017-06-27.23: | ||
+ | | 97 | 2018-06-03.09: | ||
+ | | 28 | 2018-05-22.09: | ||
+ | | 9 | 2018-05-22.09: | ||
+ | | 67 | 2018-05-01.19: | ||
+ | | 89 | 2018-04-25.13: | ||
+ | | 104 | 2019-05-17.14: | ||
+ | | 63 | 2018-12-18.14: | ||
+ | | 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 | | ||
+ | | 92 | 2018-04-27.12: | ||
+ | | 90 | 2018-04-25.14: | ||
+ | | 61 | 2018-03-31.05: | ||
+ | | 26 | 2018-03-03.01: | ||
+ | | 60 | 2018-01-25.15: | ||
+ | | 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 | | ||
+ | | 70 | 2018-01-26.03: | ||
+ | | 87 | 2018-04-24.18: | ||
+ | | 83 | 2018-04-24.18: | ||
+ | | 86 | 2018-04-24.18: | ||
+ | | 59 | 2018-02-02.15: | ||
+ | (Mostly) Done tasks | ||
+ | ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ | ||
+ | | 79 | 2018-04-14.20: | ||
+ | | 30 | 2017-06-11.16: | ||
+ | | 4 | 2017-04-24.14: | ||
+ | | 102 | 2019-03-23.11: | ||
+ | | 39 | 2019-03-09.18: | ||
+ | | 88 | 2018-04-24.18: | ||
+ | | 85 | 2018-04-24.17: | ||
+ | | 84 | 2018-04-24.17: | ||
+ | | 82 | 2018-04-24.17: | ||
+ | | 24 | 2018-04-13.09: |
todo.1567091288.txt.gz · Last modified: 2019-08-29 15:08 by tim