Previous revision
todo [2020-06-07 21:14] – [Roundup] MirZatodo [2025-02-16 21:03] (current) – [Bigger Tasks] aria
Line 7: Line 7:
 These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. +  * Sort out rails (shelf next to front of rack in G1and store somewhere more convenient 
-  * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). +  * Design a test pattern for checking/calibrating the laser cutter
-  * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). +
  
 ===== Bigger Tasks ===== ===== Bigger Tasks =====
Line 16: Line 14:
 These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
  
-  * Pull additional Cat5 cables from between G11 and G14. +  * Fix projector control 
-  * Specify and purchase shelving for G14 (full-lengths, 300mm depth). +  * Sort out spare tools (behind rack in G1and make list on wiki somewhere 
-  * Tidy-up the radio corner.+  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
 ===== Infrastructure Projects ===== ===== Infrastructure Projects =====
 +
 +  * Add a shelly smart switch to G11 (possibly G14). Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most
 +  * Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it
  
 More tasks may be found on the [[start#projects|infrastructure project pages]]. More tasks may be found on the [[start#projects|infrastructure project pages]].
Line 36: Line 38:
  
 This schematic might help: http://rigol.codenaschen.de/index.php/Schematics This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
 +
 +=== Repair / Improve filament recycler  ===
 +
 +The filament recycler we used to use for [[plasticrecycling|plastic recycling]] is broken, and also not very good apparently. It should either be repaired or replaced.
  
 ===== Other Stuff ===== ===== Other Stuff =====
  
-  * Design a test pattern for checking/calibrating the laser cutter +===== Radio Antenna TODO ==== 
-  * Build a webapp to view [[http://spaceapi.net|Space API]] data+ 
 +https://wiki.ehlab.uk/roof 
 +https://wiki.ehlab.uk/radio:projects
  
 ===== Roundup ===== ===== Roundup =====
  
 The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:
- 
  
  
Line 61: Line 68:
 | 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 | | 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 |
 | 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 | | 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 |
-| 18 | 2018-01-04.22:31:50 | Dismantle digital waterfall | 3 | None | 5 | 
 | 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 | | 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 |
 | 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 | | 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 |
Line 69: Line 75:
 | 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 | | 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 |
 | 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 | | 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 |
-| 20 | 2018-01-26.14:54:24 | Deploy Loomio for trial | 3 | 3 | 3 | 
 | 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 | | 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 |
 | 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 | | 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 |
 | 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 | | 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 |
-| 47 | 2018-04-28.15:54:46 | Test/fix reflow oven | 4 | None | 3 | 
 | 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 | | 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 |
 | 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 | | 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 |
Line 97: Line 101:
 | 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 | | 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 |
 | 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 | | 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 |
-| 76 | 2019-06-09.10:00:41 | NFC tool lockers | 3 | None | 3 | 
-| 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 | 
 | 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 | | 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
-| 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 | 
todo.1591564447.txt.gz · Last modified: 2020-06-07 21:14 by MirZa