User Tools

Site Tools


todo

This is an old revision of the document!


To-Do (How can I help?)

See also Roundup and the Members' Nights list.

Small Tasks

These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:

  • Inspect the fly zapper. If no issues found order new tubes.

Bigger Tasks

These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:

  • Pull 4 CAT5e cables from G11 rack to G14 and install the access point.

Infrastructure Projects

More tasks may be found on the infrastructure project pages.

Mini Projects

Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here.

Repair Tektronix oscilloscope

Scope has a power supply fault, and probably needs a capacitor replacement.

Repair Rigol DS1102D oscilloscope

One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.

This schematic might help: http://rigol.codenaschen.de/index.php/Schematics

Other Stuff

  • Design a test pattern for checking/calibrating the laser cutter
  • Build a webapp to view Space API data
todo.1563456498.txt.gz · Last modified: 2019-07-18 13:28 by tim

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki