User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
todo [2019-09-01 16:49]
tim [Small Tasks]
todo [2019-09-22 16:06] (current)
tim
Line 1: Line 1:
 ====== To-Do (How can I help?) ====== ====== To-Do (How can I help?) ======
  
-See also [[https://​roundup.ehlab.uk/​|Roundup]] and the [[members_nights|Members'​ Nights]] list.+See also the [[members_nights|Members'​ Nights]] list.
  
 ===== Small Tasks ===== ===== Small Tasks =====
Line 43: Line 43:
   * Design a test pattern for checking/​calibrating the laser cutter   * Design a test pattern for checking/​calibrating the laser cutter
   * Build a webapp to view [[http://​spaceapi.net|Space API]] data   * Build a webapp to view [[http://​spaceapi.net|Space API]] data
 +
 +===== Roundup =====
 +
 +The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:
 +
 +<​file>​
 +id,​activity,​title,​creator,​assignedto,​status
 +94,​2018-06-03.16:​36:​02,​COSHH Register / Chemicals,​22,​None,​3
 +99,​2018-06-03.10:​17:​27,​Fire safety policy,​22,​None,​3
 +93,​2018-06-03.10:​09:​49,​Update health and safety policy,​22,​None,​3
 +95,​2018-06-03.10:​05:​17,​Near miss / accident register & policy,​22,​None,​3
 +98,​2018-06-03.09:​31:​42,​Electrical Testing / PAT Testing policy / training,​22,​22,​3
 +96,​2018-06-03.09:​21:​59,​Electrical Safety Policy,​22,​None,​3
 +54,​2017-12-08.15:​50:​13,​Create training docs for mitre saw,​4,​None,​1
 +52,​2017-12-08.15:​49:​11,​Create training docs for table saw,​4,​None,​1
 +39,​2019-03-09.18:​45:​32,"​Update ""​Facilities""​ page on the website",​19,​None,​3
 +56,​2018-08-04.18:​02:​06,​Create training docs for bantam lathe,​4,​None,​3
 +17,​2018-06-28.15:​45:​34,​Tidy roof radio/​network equipment,​3,​None,​3
 +73,​2018-04-27.12:​15:​35,​Maintenance on Block B roof ladder,​3,​None,​1
 +88,​2018-04-24.18:​02:​49,​Set up PC for the CNC router,​4,​None,​1
 +87,​2018-04-24.18:​00:​42,​CNC router z-axis counterweight or brake,​4,​None,​1
 +85,​2018-04-24.17:​56:​03,​CNC router dust extraction,​4,​None,​1
 +84,​2018-04-24.17:​55:​39,​CNC router power/​e-stop wiring,​4,​None,​3
 +82,​2018-04-24.17:​47:​53,​Watercooling for the CNC router,​4,​None,​1
 +79,​2018-04-14.20:​48:​15,​Fix Ultimaker 2 LED Strips,​23,​None,​1
 +70,​2018-01-26.03:​13:​28,​Fix CNC spindle probe,4,4,5
 +11,​2018-01-19.00:​04:​51,​Repair Tektronix oscilloscope,​3,​None,​3
 +18,​2018-01-04.22:​31:​50,​Dismantle digital waterfall,​3,​None,​5
 +33,​2017-06-28.00:​23:​48,​Organise chemical storage and COSHH docs,​3,​None,​1
 +32,​2017-06-27.23:​46:​31,​Organise cleaning cupboard,​3,​None,​1
 +4,​2017-04-24.14:​00:​20,​Fix the NovaTurn CNC lathe,​4,​None,​1
 +76,​2019-06-09.10:​00:​41,​NFC tool lockers,​3,​None,​3
 +21,​2018-06-03.18:​42:​30,​Tool access controllers,​3,​3,​5
 +97,​2018-06-03.09:​28:​59,​Membership Policy,​21,​21,​1
 +28,​2018-05-22.09:​46:​27,​Close out the milling pledge,​4,​None,​5
 +9,​2018-05-22.09:​46:​13,​Collect remaining mitre saw pledges,​3,​None,​5
 +67,​2018-05-01.19:​57:​43,​Remote antenna switch for roof->g1 downlink,​3,​None,​3
 +89,​2018-04-25.13:​30:​09,​Mailman 3 mailing lists,3,3,3
 +24,​2018-04-13.09:​54:​56,​Automated do-not-hack stickers,​3,​3,​3
 +20,​2018-01-26.14:​54:​24,​Deploy Loomio for trial,3,3,3
 +104,​2019-05-17.14:​30:​44,​(Sliding) doors under benches in G8,​45,​None,​1
 +102,​2019-03-23.11:​45:​06,​test subject,​3,​3,​3
 +63,​2018-12-18.14:​30:​07,​Build new test lead organisation fixture,​23,​None,​3
 +69,​2018-07-18.13:​23:​09,​SatNOGS station,​3,​None,​3
 +47,​2018-04-28.15:​54:​46,​Test/​fix reflow oven,​4,​None,​3
 +92,​2018-04-27.12:​10:​08,​Name Badge Printer / Visitor Sign In,​22,​None,​1
 +91,​2018-04-27.12:​03:​35,​Hot Water for G1,3,None,3
 +90,​2018-04-25.14:​42:​53,​Consumables Inventory,​23,​None,​3
 +83,​2018-04-24.18:​17:​54,​Spindle/​VFD control from LinuxCNC,​4,​None,​1
 +86,​2018-04-24.18:​17:​45,​Tool touchoff pad for the CNC router,​4,​None,​1
 +61,​2018-03-31.05:​57:​11,​Build new terminal unit for HP bench power supply,​3,​None,​3
 +26,​2018-03-03.01:​07:​58,​Install roof-top weather station,​3,​10,​3
 +59,​2018-02-02.15:​45:​46,​Replace taps in G8 and G11,​21,​None,​3
 +60,​2018-01-25.15:​21:​14,​Obtain BNC cables and such for Oscilloscope/​Signal Generators,​23,​None,​3
 +58,​2018-01-03.00:​14:​14,​Purchase vacuum desoldering pump,​3,​None,​1
 +30,​2017-06-11.16:​09:​24,​3D Printing Supplies,​15,​15,​1
 +</​file>​
  
todo.txt ยท Last modified: 2019-09-22 16:06 by tim