User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
todo [2019-10-30 00:56] – moved "replace taps" back to open issues MirZatodo [2022-07-04 19:30] (current) MirZa
Line 9: Line 9:
   * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies.   * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies.
   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).
-  * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). 
-  * Move G6 (Al's room) access point to G11. 
  
  
Line 18: Line 16:
  
   * Pull additional Cat5 cables from between G11 and G14.   * Pull additional Cat5 cables from between G11 and G14.
-  * Specify and purchase shelving for G14 (full-lengths, 300mm depth). 
-  * Install spur for G1 water heater. 
   * Tidy-up the radio corner.   * Tidy-up the radio corner.
 +  * Fix Volume control / MQTT-IR bridge
 +  * Fix Projector control
 +
 +
 ===== Infrastructure Projects ===== ===== Infrastructure Projects =====
 +
 +  * Add a shelly smart switch to G11 (possibly G14). Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most
 +  * Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it
  
 More tasks may be found on the [[start#projects|infrastructure project pages]]. More tasks may be found on the [[start#projects|infrastructure project pages]].
Line 43: Line 46:
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
   * Build a webapp to view [[http://spaceapi.net|Space API]] data   * Build a webapp to view [[http://spaceapi.net|Space API]] data
 +
 +===== Radio / Antenna TODO ====
 +https://wiki.ehlab.uk/roof
 +https://wiki.ehlab.uk/radio:projects
  
 ===== Roundup ===== ===== Roundup =====
  
 The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:
- 
  
  
Line 62: Line 68:
 | 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 | | 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 |
 | 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 | | 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 |
-| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 | 
 | 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 | | 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 |
-| 18 | 2018-01-04.22:31:50 | Dismantle digital waterfall | 3 | None | 5 | 
 | 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 | | 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 |
 | 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 | | 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 |
Line 72: Line 76:
 | 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 | | 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 |
 | 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 | | 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 |
-| 20 | 2018-01-26.14:54:24 | Deploy Loomio for trial | 3 | 3 | 3 | 
 | 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 | | 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 |
 | 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 | | 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 |
 | 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 | | 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 |
-| 47 | 2018-04-28.15:54:46 | Test/fix reflow oven | 4 | None | 3 | 
 | 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 | | 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 |
 | 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 | | 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 |
Line 83: Line 85:
 | 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 | | 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 |
 | 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 | | 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 |
-| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 | 
 | 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 | | 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 |
 | 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 | | 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 |
 | 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 | | 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 |
 | 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 | | 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 |
-| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 |+| 59 | 2018-02-02.15:45:46 | Replace taps in G8 <del>and G11</del> | 21 | None | 3 |
  
 (Mostly) Done tasks (Mostly) Done tasks
 ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 |
 +| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 |
 | 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 | | 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 |
 | 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 | | 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 |
Line 99: Line 102:
 | 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 | | 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 |
 | 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 | | 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 |
-| 76 | 2019-06-09.10:00:41 | NFC tool lockers | 3 | None | 3 | 
-| 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 | 
 | 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 | | 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
-| 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 | 
todo.1572396963.txt.gz · Last modified: 2019-10-30 00:56 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki