User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
todo [2019-10-31 03:02] – [Bigger Tasks] MirZatodo [2025-07-06 06:52] (current) – [Bigger Tasks] simon
Line 1: Line 1:
 ====== To-Do (How can I help?) ====== ====== To-Do (How can I help?) ======
- 
-See also the [[members_nights|Members' Nights]] list. 
  
 ===== Small Tasks ===== ===== Small Tasks =====
Line 7: Line 5:
 These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. +  * Sort out rails (shelf next to front of rack in G1) and store somewhere more convenient 
-  * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). +  * Move wire spools in G14 to where the rest are in G11 
-  * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). +  * Sort some of the boxes in G14 into the parts trays 
-  * Move G6 (Al's room) access point to G11+  * Fix the clasp on the sewing box in G14 
 +  * Consolidate printer spares/parts from G2, G11, and G14
  
 ===== Bigger Tasks ===== ===== Bigger Tasks =====
Line 17: Line 15:
 These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
  
-  * Pull additional Cat5 cables from between G11 and G14. +  * Fix projector control 
-  * Specify and purchase shelving for G14 (full-lengths300mm depth)+  * More stable mount for pattern projector 
-  Install spur for G1 water heater. +  * Test the contents of the speaker/amp graveyard in G2 figure out what to keepsell, or bin
-  * Tidy-up the radio corner+    Note: Simon is working on the amp on the floor and it will need some speakers  
-  * Dismantle tap in G11 +  * Add a shelly smart switch to G11 (possibly G14)Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most 
-===== Infrastructure Projects ===== +  * Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it
- +
-More tasks may be found on the [[start#projects|infrastructure project pages]].+
  
 ===== Mini Projects ===== ===== Mini Projects =====
Line 39: Line 35:
  
 This schematic might help: http://rigol.codenaschen.de/index.php/Schematics This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
 +
  
 ===== Other Stuff ===== ===== Other Stuff =====
  
-  * Design a test pattern for checking/calibrating the laser cutter +===== Radio / Antenna TODO ====
-  * Build a webapp to view [[http://spaceapi.net|Space API]] data +
- +
-===== Roundup ====+
- +
-The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: +
- +
- +
- +
-^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ +
-| 94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 | +
-| 99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 | +
-| 93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 | +
-| 95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 | +
-| 98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 | +
-| 96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 | +
-| 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 | +
-| 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 | +
-| 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 | +
-| 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 | +
-| 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 | +
-| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 | +
-| 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 | +
-| 18 | 2018-01-04.22:31:50 | Dismantle digital waterfall | 3 | None | 5 | +
-| 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 | +
-| 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 | +
-| 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 | +
-| 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 | +
-| 9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 | +
-| 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 | +
-| 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 | +
-| 20 | 2018-01-26.14:54:24 | Deploy Loomio for trial | 3 | 3 | 3 | +
-| 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 | +
-| 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 | +
-| 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 | +
-| 47 | 2018-04-28.15:54:46 | Test/fix reflow oven | 4 | None | 3 | +
-| 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 | +
-| 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 | +
-| 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 | +
-| 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 | +
-| 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 | +
-| 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 | +
-| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 | +
-| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 | +
-| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 | +
-| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 | +
-| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 | +
-| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 |+
  
-(Mostly) Done tasks +https://wiki.ehlab.uk/roof 
-^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ +https://wiki.ehlab.uk/radio:projects
-| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 | +
-| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 | +
-| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 | +
-| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 | +
-| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 | +
-| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 | +
-| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 | +
-| 76 | 2019-06-09.10:00:41 | NFC tool lockers | 3 | None | 3 | +
-| 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 | +
-| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 | +
-| 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 |+
todo.1572490975.txt.gz · Last modified: by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki