todo [2019-10-31 03:02]
MirZa [Bigger Tasks]
todo [2020-01-30 12:40] (current)
just_ben1996
Line 10: Line 10:
   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).   * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).
   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).   * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).
-  * Move G6 (Al's room) access point to G11. 
  
  
Line 19: Line 18:
   * Pull additional Cat5 cables from between G11 and G14.   * Pull additional Cat5 cables from between G11 and G14.
   * Specify and purchase shelving for G14 (full-lengths,​ 300mm depth).   * Specify and purchase shelving for G14 (full-lengths,​ 300mm depth).
-  * Install spur for G1 water heater. 
   * Tidy-up the radio corner.   * Tidy-up the radio corner.
-  * Dismantle tap in G11 
 ===== Infrastructure Projects ===== ===== Infrastructure Projects =====
  