todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-07-08 13:05] – tim | todo [2019-08-29 10:52] – [Small Tasks] tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== New Room ===== | + | See also [[https:// |
- | Recycling: | + | ===== Small Tasks ===== |
- | * Take the junk (in old storeroom G8) to the recycling centre | + | These should be immediately actionable, describable |
- | * Take your [[clutter|junk]] away [**EVERYONE**] | + | |
- | G11: | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
+ | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | ||
+ | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | ||
+ | * Wire-up LEDs for one remaining tool locker. | ||
+ | * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | ||
+ | * Install a locker controller and LED in the battery-charging compartment. | ||
- | * Fit twin-slot shelving over sink area - postpone, see what's left after we do the new workshop | + | ===== Bigger Tasks ===== |
- | * Source a pull-handle and build a capacitive touch sensor | + | |
- | * Fit PIR sensor < | + | |
- | G8: | + | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: |
- | * Arrange disposal/re-homing of the desks [Al] | + | * Pull < |
- | * Measure room and create a plan in Sweet Home 3D | + | * < |
- | * Agree new layout [**EVERYONE**] | + | |
- | * Build and install | + | |
- | * Install wall-mounted tool boards | + | |
- | * Install wall-mounted shelves | + | |
- | * Build an air filtering system to capture dust (since G8 doesn' | + | |
- | * Build a dust extraction system to capture dust from the power tools | + | |
- | * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation | + | |
- | Financial: | + | ===== Infrastructure Projects ===== |
- | * Recruit more members to help us pay for the room [**EVERYONE**] | + | More tasks may be found on the [[start# |
- | * Notify council of status change | + | |
+ | ===== Mini Projects ===== | ||
+ | |||
+ | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. | ||
+ | |||
+ | ==== Repair Tektronix oscilloscope ==== | ||
+ | |||
+ | Scope has a power supply fault, and probably needs a capacitor replacement. | ||
+ | |||
+ | ==== Repair Rigol DS1102D oscilloscope ==== | ||
+ | |||
+ | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. | ||
+ | |||
+ | This schematic might help: http:// | ||
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap | + | * Build a webapp |
- | * Sort the PC parts and peripherals | + | |
- | * < | + |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa