todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2019-07-26 11:19] – [Small Tasks] tim | todo [2019-08-29 10:52] – [Small Tasks] tim | ||
---|---|---|---|
Line 7: | Line 7: | ||
These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: | These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: | ||
- | * < | ||
- | * < | ||
- | * Install a small shelf in the battery-charging compartment of the workshop. Shelf should be high enough to be out of the way and with just enough room to store a row of batteries. | ||
* Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. | ||
* G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | ||
* Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | ||
- | * < | + | * Wire-up LEDs for one remaining tool locker. |
+ | * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | ||
+ | * Install a locker controller | ||
===== Bigger Tasks ===== | ===== Bigger Tasks ===== |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa