todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2019-08-29 10:52] – [Small Tasks] tim | todo [2019-08-29 14:53] – [Bigger Tasks] tim | ||
---|---|---|---|
Line 18: | Line 18: | ||
These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: | ||
- | * Pull < | + | * Pull additional Cat5 cables from between |
- | * < | + | * Specify and purchase shelving for G14 (full-lengths, |
+ | * Install spur for G1 water heater. | ||
+ | * Tidy-up the radio corner. | ||
===== Infrastructure Projects ===== | ===== Infrastructure Projects ===== | ||
todo.txt · Last modified: 2022-07-04 19:30 by MirZa