User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
todo [2019-08-29 10:52] – [Small Tasks] timtodo [2019-08-29 15:08] – [Small Tasks] tim
Line 13: Line 13:
   * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip).   * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip).
   * Install a locker controller and LED in the battery-charging compartment.   * Install a locker controller and LED in the battery-charging compartment.
 +  * Move G6 (Al's room) access point to G11.
 +
  
 ===== Bigger Tasks ===== ===== Bigger Tasks =====
Line 18: Line 20:
 These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
  
-  * Pull <del>4</del> 3 CAT5e cables from G11 rack to G14 <del>and install the access point.</del> +  * Pull additional Cat5 cables from between G11 and G14
-  * <del>Fit twin-slot shelf rails in G14.</del> +  * Specify and purchase shelving for G14 (full-lengths, 300mm depth)
 +  * Install spur for G1 water heater. 
 +  * Tidy-up the radio corner.
 ===== Infrastructure Projects ===== ===== Infrastructure Projects =====
  
todo.txt · Last modified: 2022-07-04 19:30 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki