Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision |
todo [2019-08-29 10:52] – [Small Tasks] tim | todo [2019-09-22 16:06] – tim |
---|
====== To-Do (How can I help?) ====== | ====== To-Do (How can I help?) ====== |
| |
See also [[https://roundup.ehlab.uk/|Roundup]] and the [[members_nights|Members' Nights]] list. | See also the [[members_nights|Members' Nights]] list. |
| |
===== Small Tasks ===== | ===== Small Tasks ===== |
* G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). |
* Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). |
* Wire-up LEDs for one remaining tool locker. | * Move G6 (Al's room) access point to G11. |
* Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | |
* Install a locker controller and LED in the battery-charging compartment. | |
| |
===== Bigger Tasks ===== | ===== Bigger Tasks ===== |
These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: |
| |
* Pull <del>4</del> 3 CAT5e cables from G11 rack to G14 <del>and install the access point.</del> | * Pull additional Cat5 cables from between G11 and G14. |
* <del>Fit twin-slot shelf rails in G14.</del> | * Specify and purchase shelving for G14 (full-lengths, 300mm depth). |
| * Install spur for G1 water heater. |
| * Tidy-up the radio corner. |
===== Infrastructure Projects ===== | ===== Infrastructure Projects ===== |
| |
* Design a test pattern for checking/calibrating the laser cutter | * Design a test pattern for checking/calibrating the laser cutter |
* Build a webapp to view [[http://spaceapi.net|Space API]] data | * Build a webapp to view [[http://spaceapi.net|Space API]] data |
| |
| ===== Roundup ===== |
| |
| The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: |
| |
| <file> |
| id,activity,title,creator,assignedto,status |
| 94,2018-06-03.16:36:02,COSHH Register / Chemicals,22,None,3 |
| 99,2018-06-03.10:17:27,Fire safety policy,22,None,3 |
| 93,2018-06-03.10:09:49,Update health and safety policy,22,None,3 |
| 95,2018-06-03.10:05:17,Near miss / accident register & policy,22,None,3 |
| 98,2018-06-03.09:31:42,Electrical Testing / PAT Testing policy / training,22,22,3 |
| 96,2018-06-03.09:21:59,Electrical Safety Policy,22,None,3 |
| 54,2017-12-08.15:50:13,Create training docs for mitre saw,4,None,1 |
| 52,2017-12-08.15:49:11,Create training docs for table saw,4,None,1 |
| 39,2019-03-09.18:45:32,"Update ""Facilities"" page on the website",19,None,3 |
| 56,2018-08-04.18:02:06,Create training docs for bantam lathe,4,None,3 |
| 17,2018-06-28.15:45:34,Tidy roof radio/network equipment,3,None,3 |
| 73,2018-04-27.12:15:35,Maintenance on Block B roof ladder,3,None,1 |
| 88,2018-04-24.18:02:49,Set up PC for the CNC router,4,None,1 |
| 87,2018-04-24.18:00:42,CNC router z-axis counterweight or brake,4,None,1 |
| 85,2018-04-24.17:56:03,CNC router dust extraction,4,None,1 |
| 84,2018-04-24.17:55:39,CNC router power/e-stop wiring,4,None,3 |
| 82,2018-04-24.17:47:53,Watercooling for the CNC router,4,None,1 |
| 79,2018-04-14.20:48:15,Fix Ultimaker 2 LED Strips,23,None,1 |
| 70,2018-01-26.03:13:28,Fix CNC spindle probe,4,4,5 |
| 11,2018-01-19.00:04:51,Repair Tektronix oscilloscope,3,None,3 |
| 18,2018-01-04.22:31:50,Dismantle digital waterfall,3,None,5 |
| 33,2017-06-28.00:23:48,Organise chemical storage and COSHH docs,3,None,1 |
| 32,2017-06-27.23:46:31,Organise cleaning cupboard,3,None,1 |
| 4,2017-04-24.14:00:20,Fix the NovaTurn CNC lathe,4,None,1 |
| 76,2019-06-09.10:00:41,NFC tool lockers,3,None,3 |
| 21,2018-06-03.18:42:30,Tool access controllers,3,3,5 |
| 97,2018-06-03.09:28:59,Membership Policy,21,21,1 |
| 28,2018-05-22.09:46:27,Close out the milling pledge,4,None,5 |
| 9,2018-05-22.09:46:13,Collect remaining mitre saw pledges,3,None,5 |
| 67,2018-05-01.19:57:43,Remote antenna switch for roof->g1 downlink,3,None,3 |
| 89,2018-04-25.13:30:09,Mailman 3 mailing lists,3,3,3 |
| 24,2018-04-13.09:54:56,Automated do-not-hack stickers,3,3,3 |
| 20,2018-01-26.14:54:24,Deploy Loomio for trial,3,3,3 |
| 104,2019-05-17.14:30:44,(Sliding) doors under benches in G8,45,None,1 |
| 102,2019-03-23.11:45:06,test subject,3,3,3 |
| 63,2018-12-18.14:30:07,Build new test lead organisation fixture,23,None,3 |
| 69,2018-07-18.13:23:09,SatNOGS station,3,None,3 |
| 47,2018-04-28.15:54:46,Test/fix reflow oven,4,None,3 |
| 92,2018-04-27.12:10:08,Name Badge Printer / Visitor Sign In,22,None,1 |
| 91,2018-04-27.12:03:35,Hot Water for G1,3,None,3 |
| 90,2018-04-25.14:42:53,Consumables Inventory,23,None,3 |
| 83,2018-04-24.18:17:54,Spindle/VFD control from LinuxCNC,4,None,1 |
| 86,2018-04-24.18:17:45,Tool touchoff pad for the CNC router,4,None,1 |
| 61,2018-03-31.05:57:11,Build new terminal unit for HP bench power supply,3,None,3 |
| 26,2018-03-03.01:07:58,Install roof-top weather station,3,10,3 |
| 59,2018-02-02.15:45:46,Replace taps in G8 and G11,21,None,3 |
| 60,2018-01-25.15:21:14,Obtain BNC cables and such for Oscilloscope/Signal Generators,23,None,3 |
| 58,2018-01-03.00:14:14,Purchase vacuum desoldering pump,3,None,1 |
| 30,2017-06-11.16:09:24,3D Printing Supplies,15,15,1 |
| </file> |
| |