G14 Setup

Tasks

These tasks can be started now:

  • Install extension cable from corner (by window) into the ceiling space and over to above the door.
  • Fit mains cable and plug to access control power supply, and PAT test.
  • Fit access control power supply to wall above door.
  • Install electric lock into door and frame.
  • Fit access controller box to interior wall.
  • Fit access control reader box to wall outside door.
  • Order door-closed sensor (magnetic reed sensor).
  • Order/source a combined euro-profile and handle for door.
  • Run 12V two-core from PSU to access control box via conduit.
  • Laser-cut an improved 1-gang plate for NFC reader.
  • Build access control reader. → Tim

Access control

The door will be fitted with the same type of lock as used for G2 and G8. The lock is currently on order and all other components are in stock.

Floor

The floor has damage that will need to be filled. Then it can be painted or covered with vinyl (this is a more practical task than for G1 as the space is small and already empty).

ESD flooring has been proposed but is likely to be expensive. We have a roll of ESD flooring but it is soft (anti-fatigue, designed for standing workstations) and will be easily torn by chairs.

Networking

Cables will be run from the server rack in G11 (2-4 would be appropriate). A UniFi access point will be installed (this is in stock).

Benches and storage

Proposed: 75-80cm benches against the long walls of the room. No bench on the short ends (because corners are too restrictive). Use the short end (away from the door) for storage. Shelving over the benches (some mix of general storage and ready-to-use equipment).

Discussions ongoing.