This is an old revision of the document!
Table of Contents
G14 Setup
Tasks
These tasks can be started now:
- Order door-closed sensor (magnetic reed sensor).
- Order/source a combined euro-profile and handle for door.
Access control
The door will be fitted with the same type of lock as used for G2 and G8. The lock is currently on order and all other components are in stock.
Floor
The floor has damage that will need to be filled. Then it can be painted or covered with vinyl (this is a more practical task than for G1 as the space is small and already empty).
ESD flooring has been proposed but is likely to be expensive. We have a roll of ESD flooring but it is soft (anti-fatigue, designed for standing workstations) and will be easily torn by chairs.
Networking
Cables will be run from the server rack in G11 (2-4 would be appropriate). A UniFi access point will be installed (this is in stock).
Benches and storage
Proposed: 75-80cm benches against the long walls of the room. No bench on the short ends (because corners are too restrictive). Use the short end (away from the door) for storage. Shelving over the benches (some mix of general storage and ready-to-use equipment).
Discussions ongoing.