Line 5: Line 5:
 These tasks can be started now: These tasks can be started now:
  
-  * Order/​source a combined euro-profile and handle for door.+  * <​del>​Install shelf for PCB etch tank</​del>​ 
 +  * <​del>​Deep shelf for PSU and function generator</​del>​ 
 +  * Shelves (see below) 
 +  * <del>Order/​source a combined euro-profile and handle for door.</​del>​
   * Run 4 cat5 cables from G11 rack to G14 roof space   * Run 4 cat5 cables from G11 rack to G14 roof space
-  * <​del>​Install UniFi access point</​del>​ 
-  * <​del>​Order new legs for sink unit</​del>​ 
-  * Fit benches 
-    * <​del>​Straighten the wavy worktop</​del>​ 
-    * <​del>​Attach wooden battens to the wall to support the back of the worktops</​del>​ 
-    * <​del>​Chamfer the worktop edges</​del>​ 
-    * <​del>​Sand & oil the worktops</​del>​ 
-      * <​del>​Coat 1</​del>​ 
-      * <​del>​Coat 2</​del>​ 
-      * <​del>​Coat 3</​del>​ 
-    * Attach legs and fit the worktops, attaching them to the battens with L brackets - slotted so they can move up and down a bit(?) 
-    * Install more battens to support the worktop corner/edge 
-  * Find wood to make shelves (mostly 30cm depth, but some deeper for the PSU and function generator) 
   * Sort/​tidy/​prepare electronics components for the move   * Sort/​tidy/​prepare electronics components for the move
 +  * <​del>​Clean ESD mats and trim to match worktops</​del>​
 +  * <​del>​Install louvre panels on short wall below conduit [1 done, 2 to go]</​del>​
 +  * <​del>​Steal the worktop that currently covers the 2nd sink in G1. Cut it to make a 150x55cm shelf.</​del>​
 +  * Obtain some chairs (3-4, computer operator chairs or "​guest"​ chairs)
  
 +===== Shelves =====
 +
 +The vertical brackets are installed but we will need to order more horizontals,​ and to source the shelf boards. Given the amount of worktop that we will be removing from G1 later on, it might be worth installing only a limited amount of shelving for now instead of buying new material.
 +
 +On the narrow end of the room, above the component drawers:
 +
 +  * 3 of 226cm x 30-31cm (slightly less than 226 to allow for the conduit).
 +
 +To the left of the window:
 +
 +  * <del> 150cm x 54cm (for the function generator and HP power supply) </​del>​
 +  * <​del>​150cm x 25-30cm (for oscilloscope,​ soldering tools, etc)</​del>​
 +
 +On the long wall:
 +
 +  * Many of ~290cm x 30cm (general storage)
 +  * ~290cm x 25-30cm (for oscilloscope,​ soldering tools, etc)
 +
 +To the right of the sink, attached to wall and sink unit:
 +
 +  * <​del>​Recessed shelf for PCB etch tank</​del>​.
  