-====== G14 Setup ====== 
- 
-===== Tasks ===== 
- 
-These tasks can be started now: 
- 
-  * Order/source a combined euro-profile and handle for door. 
-  * Run 4 cat5 cables from G11 rack to G14 roof space 
-  * <del>Install UniFi access point</del> 
-  * <del>Order new legs for sink unit</del> 
-  * Fit benches 
-    * <del>Straighten the wavy worktop</del> 
-    * <del>Attach wooden battens to the wall to support the back of the worktops</del> 
-    * <del>Chamfer the worktop edges</del> 
-    * <del>Sand & oil the worktops</del> 
-      * <del>Coat 1</del> 
-      * <del>Coat 2</del> 
-      * <del>Coat 3</del> 
-    * Attach legs and fit the worktops, attaching them to the battens with L brackets - slotted so they can move up and down a bit(?) 
-    * Install more battens to support the worktop corner/edge 
-  * Find wood to make shelves (mostly 30cm depth, but some deeper for the PSU and function generator) 
-  * Sort/tidy/prepare electronics components for the move 
- 
  