todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-10-14 15:57] – [Finish moving the workshop from G2 to G8] tim | todo [2019-08-29 14:53] – [Bigger Tasks] tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also [[https:// |
- | ==== Drill organisation | + | ===== Small Tasks ===== |
- | All of our drills (bits) currently sit in a single | + | These should be immediately actionable, describable |
- | * Make or buy an organiser: | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | * G1 hifi shelves: replace the short brackets with long brackets |
- | * Sections for HSS, brad-point and masonry | + | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). |
- | * Audit the drills. Dispose of bad ones. Sharpen | + | * Wire-up LEDs for one remaining tool locker. |
- | * Identify | + | * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). |
+ | * Install | ||
- | ==== Finish moving the workshop from G2 to G8 ==== | + | ===== Bigger Tasks ===== |
- | * Clean the blue storage bins in G8 | + | These should be immediately actionable, describable |
- | * Move the tools and supplies from G2 to G8 | + | |
- | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | + | |
- | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | + | |
- | * Fit a smoke alarm in G8 (early warning system | + | |
- | ===== Other Stuff ===== | + | * Pull additional Cat5 cables from between G11 and G14. |
+ | * Specify and purchase shelving for G14 (full-lengths, | ||
+ | * Install spur for G1 water heater. | ||
+ | * Tidy-up the radio corner. | ||
+ | ===== Infrastructure Projects | ||
- | * Design a test pattern for checking/ | + | More tasks may be found on the [[start# |
- | * Update OpenStreepMap to identify all the local takeaways | + | |
- | * Sort the PC parts and peripherals | + | |
- | * Build a webapp to view [[http:// | + | |
- | ---- | + | ===== Mini Projects ===== |
- | ===== Completed | + | Projects |
- | ==== Fit shelving under G8 workbenches | + | ==== Repair Tektronix oscilloscope |
- | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | ==== Repair Rigol DS1102D oscilloscope |
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture | + | One channel has failed, believed |
- | ==== Install ventilation in G8 Workshop ==== | + | This schematic might help: http:// |
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | + | ===== Other Stuff ===== |
- | + | ||
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | + | |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
+ | * Design a test pattern for checking/ | ||
+ | * Build a webapp to view [[http:// | ||
todo.txt · Last modified: 2022-07-04 19:30 by MirZa