User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
todo [2019-10-30 00:42] – formatted roundup archive as table MirZatodo [2025-02-16 21:03] (current) – [Bigger Tasks] aria
Line 7: Line 7:
 These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. +  * Sort out rails (shelf next to front of rack in G1and store somewhere more convenient 
-  * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). +  * Design a test pattern for checking/calibrating the laser cutter
-  * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). +
-  * Move G6 (Al's room) access point to G11. +
  
 ===== Bigger Tasks ===== ===== Bigger Tasks =====
Line 17: Line 14:
 These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
  
-  * Pull additional Cat5 cables from between G11 and G14. +  * Fix projector control 
-  * Specify and purchase shelving for G14 (full-lengths, 300mm depth). +  * Sort out spare tools (behind rack in G1and make list on wiki somewhere 
-  * Install spur for G1 water heater+  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
-  * Tidy-up the radio corner.+
 ===== Infrastructure Projects ===== ===== Infrastructure Projects =====
 +
 +  * Add a shelly smart switch to G11 (possibly G14). Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most
 +  * Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it
  
 More tasks may be found on the [[start#projects|infrastructure project pages]]. More tasks may be found on the [[start#projects|infrastructure project pages]].
Line 38: Line 38:
  
 This schematic might help: http://rigol.codenaschen.de/index.php/Schematics This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
 +
 +=== Repair / Improve filament recycler  ===
 +
 +The filament recycler we used to use for [[plasticrecycling|plastic recycling]] is broken, and also not very good apparently. It should either be repaired or replaced.
  
 ===== Other Stuff ===== ===== Other Stuff =====
  
-  * Design a test pattern for checking/calibrating the laser cutter +===== Radio Antenna TODO ==== 
-  * Build a webapp to view [[http://spaceapi.net|Space API]] data+ 
 +https://wiki.ehlab.uk/roof 
 +https://wiki.ehlab.uk/radio:projects
  
 ===== Roundup ===== ===== Roundup =====
  
 The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:
- 
  
  
Line 59: Line 64:
 | 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 | | 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 |
 | 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 | | 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 |
-| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 | 
 | 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 | | 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 |
 | 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 | | 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 |
 | 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 | | 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 |
-| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 | 
-| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 | 
-| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 | 
-| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 | 
-| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 | 
-| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 | 
-| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 | 
 | 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 | | 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 |
-| 18 | 2018-01-04.22:31:50 | Dismantle digital waterfall | 3 | None | 5 | 
 | 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 | | 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 |
 | 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 | | 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 |
-| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 | 
-| 76 | 2019-06-09.10:00:41 | NFC tool lockers | 3 | None | 3 | 
-| 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 | 
 | 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 | | 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 |
 | 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 | | 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 |
Line 82: Line 75:
 | 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 | | 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 |
 | 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 | | 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 |
-| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 | 
-| 20 | 2018-01-26.14:54:24 | Deploy Loomio for trial | 3 | 3 | 3 | 
 | 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 | | 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 |
-| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 | 
 | 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 | | 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 |
 | 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 | | 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 |
-| 47 | 2018-04-28.15:54:46 | Test/fix reflow oven | 4 | None | 3 | 
 | 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 | | 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 |
-| 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 | 
 | 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 | | 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 |
-| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 | 
-| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 | 
 | 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 | | 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 |
 | 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 | | 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 |
-| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 | 
 | 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 | | 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 |
 | 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 | | 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 |
 +| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 |
 +| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 |
 +| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 |
 +| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 |
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 <del>and G11</del> | 21 | None | 3 |
 +
 +(Mostly) Done tasks
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 |
 | 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 | | 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 |
 +| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 |
 +| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 |
 +| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 |
 +| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 |
 +| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 |
 +| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 |
 +| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 |
 +| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
todo.1572396176.txt.gz · Last modified: 2019-10-30 00:42 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki