To-Do (How can I help?)

See also the Members' Nights list.

Small Tasks

These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:

  • Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies.
  • G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).
  • Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc).
  • Move G6 (Al's room) access point to G11.

Bigger Tasks

These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:

  • Pull additional Cat5 cables from between G11 and G14.
  • Specify and purchase shelving for G14 (full-lengths, 300mm depth).
  • Install spur for G1 water heater.
  • Tidy-up the radio corner.

Infrastructure Projects

More tasks may be found on the infrastructure project pages.

Mini Projects

Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here.

Repair Tektronix oscilloscope

Scope has a power supply fault, and probably needs a capacitor replacement.

Repair Rigol DS1102D oscilloscope

One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.

This schematic might help: http://rigol.codenaschen.de/index.php/Schematics

Other Stuff

  • Design a test pattern for checking/calibrating the laser cutter
  • Build a webapp to view Space API data

Roundup

The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:

id activity title creator assigned to status
94 2018-06-03.16:36:02 COSHH Register / Chemicals 22 None 3
99 2018-06-03.10:17:27 Fire safety policy 22 None 3
93 2018-06-03.10:09:49 Update health and safety policy 22 None 3
95 2018-06-03.10:05:17 Near miss / accident register & policy 22 None 3
98 2018-06-03.09:31:42 Electrical Testing / PAT Testing policy / training 22 22 3
96 2018-06-03.09:21:59 Electrical Safety Policy 22 None 3
54 2017-12-08.15:50:13 Create training docs for mitre saw 4 None 1
52 2017-12-08.15:49:11 Create training docs for table saw 4 None 1
39 2019-03-09.18:45:32 “Update ”“Facilities”“ page on the website” 19 None 3
56 2018-08-04.18:02:06 Create training docs for bantam lathe 4 None 3
17 2018-06-28.15:45:34 Tidy roof radio/network equipment 3 None 3
73 2018-04-27.12:15:35 Maintenance on Block B roof ladder 3 None 1
88 2018-04-24.18:02:49 Set up PC for the CNC router 4 None 1
87 2018-04-24.18:00:42 CNC router z-axis counterweight or brake 4 None 1
85 2018-04-24.17:56:03 CNC router dust extraction 4 None 1
84 2018-04-24.17:55:39 CNC router power/e-stop wiring 4 None 3
82 2018-04-24.17:47:53 Watercooling for the CNC router 4 None 1
79 2018-04-14.20:48:15 Fix Ultimaker 2 LED Strips 23 None 1
70 2018-01-26.03:13:28 Fix CNC spindle probe 4 4 5
11 2018-01-19.00:04:51 Repair Tektronix oscilloscope 3 None 3
18 2018-01-04.22:31:50 Dismantle digital waterfall 3 None 5
33 2017-06-28.00:23:48 Organise chemical storage and COSHH docs 3 None 1
32 2017-06-27.23:46:31 Organise cleaning cupboard 3 None 1
4 2017-04-24.14:00:20 Fix the NovaTurn CNC lathe 4 None 1
76 2019-06-09.10:00:41 NFC tool lockers 3 None 3
21 2018-06-03.18:42:30 Tool access controllers 3 3 5
97 2018-06-03.09:28:59 Membership Policy 21 21 1
28 2018-05-22.09:46:27 Close out the milling pledge 4 None 5
9 2018-05-22.09:46:13 Collect remaining mitre saw pledges 3 None 5
67 2018-05-01.19:57:43 Remote antenna switch for roof→g1 downlink 3 None 3
89 2018-04-25.13:30:09 Mailman 3 mailing lists 3 3 3
24 2018-04-13.09:54:56 Automated do-not-hack stickers 3 3 3
20 2018-01-26.14:54:24 Deploy Loomio for trial 3 3 3
104 2019-05-17.14:30:44 (Sliding) doors under benches in G8 45 None 1
102 2019-03-23.11:45:06 test subject 3 3 3
63 2018-12-18.14:30:07 Build new test lead organisation fixture 23 None 3
69 2018-07-18.13:23:09 SatNOGS station 3 None 3
47 2018-04-28.15:54:46 Test/fix reflow oven 4 None 3
92 2018-04-27.12:10:08 Name Badge Printer / Visitor Sign In 22 None 1
91 2018-04-27.12:03:35 Hot Water for G1 3 None 3
90 2018-04-25.14:42:53 Consumables Inventory 23 None 3
83 2018-04-24.18:17:54 Spindle/VFD control from LinuxCNC 4 None 1
86 2018-04-24.18:17:45 Tool touchoff pad for the CNC router 4 None 1
61 2018-03-31.05:57:11 Build new terminal unit for HP bench power supply 3 None 3
26 2018-03-03.01:07:58 Install roof-top weather station 3 10 3
59 2018-02-02.15:45:46 Replace taps in G8 and G11 21 None 3
60 2018-01-25.15:21:14 Obtain BNC cables and such for Oscilloscope/Signal Generators 23 None 3
58 2018-01-03.00:14:14 Purchase vacuum desoldering pump 3 None 1
30 2017-06-11.16:09:24 3D Printing Supplies 15 15 1