The general plan of refurbishment of G1 (the main room) is to make it nicer and more welcoming.
Get the floor done while the lab is closed. Rip almost everything out of G1. Move in only the necessary bits.
What are we actually trying to achieve with the design?
Agenda:
Butterfly latches: Adam Hall 17370C Butterfly latch keepers: Adam Hall 17370K
we need 32 latch+keeper sets for the tables
for “docking” the wheeled divider, we need four latches and eight latch keepers (for the two “docking ports”)