See also the Members' Nights list.
These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
More tasks may be found on the infrastructure project pages.
Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here.
Scope has a power supply fault, and probably needs a capacitor replacement.
One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.
This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:
id | activity | title | creator | assigned to | status |
---|---|---|---|---|---|
94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 |
99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 |
93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 |
95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 |
98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 |
96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 |
54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 |
52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 |
56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 |
17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 |
73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 |
11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 |
33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 |
32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 |
97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 |
28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 |
9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 |
67 | 2018-05-01.19:57:43 | Remote antenna switch for roof→g1 downlink | 3 | None | 3 |
89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 |
104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 |
63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 |
69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 |
92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 |
90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 |
61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 |
26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 |
60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 |
58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 |
70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 |
87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 |
83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 |
86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 |
59 | 2018-02-02.15:45:46 | Replace taps in G8 | 21 | None | 3 |
(Mostly) Done tasks
id | activity | title | creator | assigned to | status |
---|---|---|---|---|---|
79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 |
30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 |
4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 |
102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 |
39 | 2019-03-09.18:45:32 | “Update ”“Facilities”“ page on the website” | 19 | None | 3 |
88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 |
85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 |
84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 |
82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 |
24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |