This is an old revision of the document!
Table of Contents
To-Do (How can I help?)
See also the Members' Nights list.
Small Tasks
These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
- Sort out rails (shelf next to front of rack in G1) and store somewhere more convenient
- Design a test pattern for checking/calibrating the laser cutter
Bigger Tasks
These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
- Fix Projector control
- Fix air vent control in G1
- Sort out spare tools (behind rack in G1) and make list on wiki somewhere
- Build a webapp to view Space API data
Infrastructure Projects
- Add a shelly smart switch to G11 (possibly G14). Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most
- Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it
More tasks may be found on the infrastructure project pages.
Mini Projects
Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here.
Repair Tektronix oscilloscope
Scope has a power supply fault, and probably needs a capacitor replacement.
Repair Rigol DS1102D oscilloscope
One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.
This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
Repair / Improve filament recycler
The filament recycler we used to use for plastic recycling is broken, and also not very good apparently. It should either be repaired or replaced.
Other Stuff
Radio / Antenna TODO
Roundup
The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:
id | activity | title | creator | assigned to | status |
---|---|---|---|---|---|
94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 |
99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 |
93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 |
95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 |
98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 |
96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 |
54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 |
52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 |
56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 |
17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 |
73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 |
11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 |
33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 |
32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 |
97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 |
28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 |
9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 |
67 | 2018-05-01.19:57:43 | Remote antenna switch for roof→g1 downlink | 3 | None | 3 |
89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 |
104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 |
63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 |
69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 |
92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 |
90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 |
61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 |
26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 |
60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 |
58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 |
70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 |
87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 |
83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 |
86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 |
59 | 2018-02-02.15:45:46 | Replace taps in G8 | 21 | None | 3 |
(Mostly) Done tasks
id | activity | title | creator | assigned to | status |
---|---|---|---|---|---|
79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 |
30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 |
4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 |
102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 |
39 | 2019-03-09.18:45:32 | “Update ”“Facilities”“ page on the website” | 19 | None | 3 |
88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 |
85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 |
84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 |
82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 |
24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |